Walk past the Arch this month and you will still see orange barrels, exposed dirt, and a chain-link perimeter where College Avenue used to run. It looks unfinished because it is. But the block between East Broad Street and East Clayton Street, the one everyone in Athens just calls College Square, is closer to done than it has been in eight months of construction, and the timing is not an accident. The city has built its schedule around a single hard deadline: the University of Georgia's first home game of the season on September 5.
What's actually happening underneath the noise is bigger than a streetscape refresh. Athens has been a city since 1801. In all that time, it has never had a formal town square, the kind of civic gathering space that older Southern towns built into their original plats. What's rising from this torn-up block is the first one, financed largely off downtown parking revenue rather than a citywide tax increase, and engineered specifically to be ready before students, alumni, and visitors flood back downtown for football season.
A Downtown That Never Had a Center
The idea of closing this stretch of College Avenue to cars is not new. Athens-Clarke County planners have talked about it since the 1970s, when city leaders first floated the idea as a way to compete with the retail pull of Georgia Square Mall. Nothing came of it for decades. The block stayed a two-way cut-through, last given a real renovation back in 1981.
What changed was the pandemic. In October 2020, the city closed College Avenue to vehicle traffic as a six-month pilot, part of the broader push to create outdoor dining space during COVID. Commissioners liked what they saw. In the spring of 2021 they voted to make the closure permanent, and by August of that year the Athens Downtown Development Authority had filed a redesign proposal under the county's 2023 transportation sales tax initiative. It took until November 2024 for the Mayor and Commission to approve the intergovernmental agreement that let the real design work begin.
So the car-free plaza itself is five years old at this point. What arrives this fall is the first version of it that was actually built to last, rather than adapted from a road.
Why the Street Had to Come Up First
The construction sequence explains a lot about why this block looked worse in the spring than it does now. Crews broke ground on January 28, 2026, and the first phase was also the most disruptive one by design: the entire center of College Avenue was closed so utility crews could get sewer, water, and stormwater infrastructure into the ground before anything visible went in on top. Getting that work done early meant later phases, the ones focused on paving and seating and lighting, could move through the corridor in smaller sections while keeping storefronts reachable.
Here is the arc from idea to opening day, condensed:
| Milestone | Date |
|---|---|
| City first floats closing College Avenue | 1970s |
| Last full renovation of the block | 1981 |
| Pandemic pilot closes the street to cars | October 8, 2020 |
| Closure made permanent | Spring 2021 |
| ADDA files redesign proposal under TSPLOST 2023 | August 2021 |
| Intergovernmental agreement approved | November 6, 2024 |
| Construction begins | January 28, 2026 |
| Target: open before UGA's first home game | September 5, 2026 |
| Final completion, punch-list work | October 2026 |
Athens Downtown Development Authority planning director David Lynn described the project to commissioners as one the downtown community had been waiting on for a long time. Getting it there took longer than the timeline above might suggest, since design work with the firm SPG Planning and Engineers wasn't presented until a special work session in April 2025, less than a year before shovels hit the ground.
What Actually Changes on the Block
The finished square will look and function differently from the street it replaced, not just cosmetically. According to the project's official scope, the changes include:
- Brick pavers across the full block, replacing the asphalt that has been there since 1981
- A curbless, building-to-building surface designed for ADA access
- A pocket park and tapered steps that work with the natural grade change toward Broad Street
- A dedicated plaza feature the design team has labeled the "Spirit of Athens" space
- The block's old bus shelter rebuilt as a small gathering structure rather than a simple stop
- Shade sails and updated canopy lighting for evening use
- Larger planters and shade trees chosen specifically to echo the tree cover on UGA's North Campus across Broad Street
- A mix of fixed and café-style seating, up from the handful of picnic tables that have been there since the pandemic
The project's cost has moved around in public reporting. Early estimates circulated as high as $9 million in 2025 coverage, before the county settled on a final figure closer to $6.5 million. Most of that is coming from ADDA financing backed by downtown parking revenue rather than general property taxes, with $500,000 layered in from the county's 2023 transportation sales tax as Project 28. In practical terms, the people paying for most of this square are the people who park downtown, not homeowners across the rest of the county.
One detail still unresolved as of last year's reporting: whether a sculpture by artist Harold Rittenberry will end up somewhere in the finished plaza. It was under discussion but not confirmed.
The Block Has Turned Over Before
Part of what makes this project land differently for longtime residents is that this exact stretch has already changed once inside living memory. The corner that now holds a walk-up Chick-fil-A used to be the site of Athens' original Varsity restaurant. The storefront now occupied by the boutique Dress Up Athens used to be Barnett's newsstand, the place generations of UGA students went to browse magazines and grab a snack between classes.
Not everyone near the construction has been thrilled with the process. Business owners along the block told local reporters they worried the months-long build would hurt foot traffic in the short term, even if they supported the long-term vision. Sheridan Construction, the Macon-based contractor handling the build, assigned a dedicated community liaison specifically to keep those merchants informed about access changes as work moved through each phase. Whether that softened the disruption is something only the shop owners who lived through it can really answer.
What This Means Once the Season Starts
The square's builders have said outright that it was designed with more in mind than foot traffic on an ordinary Tuesday. The wider paved surface and added seating are meant to host farmers markets, small concerts, and pop-up events, the kind of programming downtown Athens already leans on during slower stretches of the academic calendar. Nearly 10,000 students already live downtown according to ADDA's own estimate, and a plaza built to host events rather than just funnel people through it is a different kind of public space than the parking-adjacent street it replaced.
The September 5 target is a soft one. County officials have been clear that substantial completion, not full completion, is the goal before kickoff, with punch-list items expected to continue into October. That means the first home game crowd may still see a stray cone or a section of fresh sod that hasn't quite filled in. It also means the square residents walk through this October will look noticeably more finished than the one they see on opening weekend.
What's easy to miss in the run-up to football season is that this isn't a seasonal upgrade. It's the first time in 225 years that Athens has had a built, permanent town square rather than a converted street. That is a slower kind of change than a new restaurant opening or a road resurfacing, and it is the kind that tends to matter more once people stop noticing the construction and start using the space.
If you are watching downtown Athens change and thinking about what it means for property near the center of it, J Brand Realty knows this market from the ground up. Request a property valuation and consultation whenever you are ready to talk specifics.